HERTFORDSHIRE

This project involved transforming what was a dark, dated office space into a light, bright, contemporary environment. We assisted the client with what changes needed to be implemented to provide the best outcome, along with implementing a variety of fixing systems to suit what was in situ as well as creating new partition screens. We were able to offer powder coating and supplied all ironmongery.

Beginning installation of Glass Partitions

Image 1 of 4

CROYDON TOWN HALL

At Croydon Town Hall we removed two sets of outdated, faulty, electric sliding doors and replaced these with toughened glass doors with stainless steel patch fixings and self-closing springs. Using ‘frameless’ glass doors creates an open feeling and prevents the area appearing congested. These doors can be used in many applications, whether domestic or commercial, for both internal and external openings.

Doors During Installation

Image 1 of 4

CENTRAL LONDON

This project consisted of the supply and installation of partition doors and screens for Pre-Paid Ltd in London’s Regent Street, creating an innovative space, turning 1200 m2 in to 6 glass conference rooms. We also supplied and fitted all relevant ironmongery.

Glass Partitions in progress

Image 2 of 4